1. Service
  2. Performance
  3. Project Services (2019-2020)

Home Service > Performance > Project Services (2019-2020)

Project Services (2019-2020)

Hazards and Risk Assessment, Railway RAMS/S SA, FSE and ISA / IV&V

Item No.

Area

Client / Consignor

Project service description

1

Taiwan

Delta Electronic, Inc. (TÜV NORD Asia Pacific Ltd. Taiwan Branch)

IEC 62443-4-1 Conformance Assessment Consultancy Service for Secure Product Development Lifecycle Process Establishment

2

Taiwan

CPC Co., Taiwan

Taiwan PetroChina No.4 Light Oil Cracking Plant HAZOP Study, LOPA, and SIS Functional Safety Engineering Implementation Consulting Service for the #4 Naphtha Cracking Unit of the Linyuan Plant

3

Taiwan

Mitac Information Technology Corp.

System Assurance Consultant Services for the Power Supply System of the San Ying Line Rapid Transit System (New Taipei City RTS)

4

Taiwan

TASCO Group

HAZOP Study, LOPA, SIL Assessment, LOPC Event Consequence Analysis, and F&G Design Review for the MTBE#1 reconstruction project of the TASCO Linyuan plant

5

Taiwan

Mitac Information Technology Corp.

System Assurance Consultant Services for the Power Supply, SCADA and Communications Systems of the Taipei Circular Line – Phase 1 (T&C Phase)

6

Taiwan

Mitac Information Technology Corp.

System Assurance Consultant Services for the SCADA and Communication System of the San Ying Line Rapid Transit System (New Taipei City RTS)

7

Taiwan

Lloyd’s Register Group Ltd. – Taiwan (CPC Co., Taiwan)

PSM Audits for the Miaoli site of the Exploration and Production Business Div. and for the Shenao site of the LPG Business Div.

Performance 1289652