Service Introduction

QRA, PHA/HAZOP/LOPA/SIL, RBI and ISO 14224/API 689 in Chemical, Oil & Gas and Hi-tech industries (2008.03-2018.07)

QRA, PHA/HAZOP/LOPA/SIL, RBI and ISO 14224/API 689 in Chemical, Oil & Gas and Hi-tech industries (2008.03-2018.07)

4eca527b2927d9a542498a9a63da40d5.png
5f4b5660fc68c225938cac716088f0c6.png
e64ce41294c0af96e4a1fc9ade9b5e12.png
9288d0755f7f58e926b695ed695859b4.png
9f4b6e1ef9f87a5fd5bb1fddf7184a78.png
70228ae84a0d9055472262b705c019d9.png
f33ba78a5eb89fe031ef4c5d11f6c71a.png

Note:

: Semi-quantified HazOp/LOPA/RiskGraph & SIF’s SIL determination & SRS 

: SIF’s Design & SIL Verification

: SIF’s Validation Plan & Validation & Maintenance Plan 

: Safety Lifecycle Management

:QRA(CPQRA)By using TNO Effects 8.1 to estimate the Consequenceby using TNO Riskcurves 7.6.5 to estimate Social Risk.

:Quantitative RBI (Assessment)By using TNO Effects 8.1 to estimate the Consequenceby using TNO Riskcurves 7.6.5 to estimate Social Risk. 

:ISO14224/API 689/FMEA/CA: Process Equipment Reliability Data Collection & FMEA

: Fire & Gas System SIL Assessment

: Lead & Participate for the whole process

: Lead & Participated for parts of process